Wednesday, October 16, 2024

Multiple Appreciations Bundle 1982

 

Observing a tendency of designing, creative modifications and fabricating; senior management decided to declare a separate cell in Instrument Overhaul Shop named “Test Panels Fabrication Cell” under my command with two creative minded Junior Officers.

(Picture from my Personal File)

PIA ordered a total of ten DC-10 aircrafts from McDonald Douglas Co. USA. A package was offered from the seller to making a wide body hanger or all the test equipment along with aircrafts. Buyer preferred to get hanger, so not even a single test panel was received to test Automatic Flight Guidance System components of the aircraft.

I accepted the challenge to design and fabricate all the test panels required in instrument Overhaul shop. With the help of just two assistants I designed and fabricated a total of 52 test panels saving a substantial amount of foreign exchange for PIA within three years with respect to the failure rate of aircraft’s autopilot components.

This remarkable achieving of mine was highlighted to Higher Management and an appreciation letter from Director Engineering was awarded to me which was first ever appreciation letter from Director Engineering Syed Ajaz Ali.



No comments:

Post a Comment